Wind
Starting from July 2,000 employees will be laid off from CEO
2,000 employees of Oltenia Energy Complex (CEO) will be dismissed from 1 July 2016, announced the state energy company’s leadership.…
The number of green certificates traded in the first two months fell by more than 1200%
In the first two months of this year, on OPCOM energy exchange, were traded 987 green certificates, over 12 times…
V. Grigorescu: Coal is essential for the continuity of energy supply in Romania
Energy Minister Victor Grigorescu established the Steering Committee for mining, in order to analyze the current state of the energy…
PATRES exposed the wishes of renewable producers to the Energy Union officer
The plight of energy producers from renewable sources in Romania, the need to simplify the existing support scheme, namely the…
Hundreds of employees from CEH will stop temporarily their activity
Approximately 600 employees from Complexul Energetic Hunedoara (CEH), TESA personnel, will be sent into a “pending vacation” for the temporary…
60 miners from Lonea gave up the protest, 40 are still underground
Some of the miners barricaded in the underground of Lonea and Vulcan mine agreed to resurface, but their protest will…
Monsson Group: 40% of renewable energy producers are close to bankruptcy
This year is decisive for the survival of the renewable energy units, whereas over 40% of the producers on these…
Energy Minister: CEO would have worked better with restructuring in advance
The problems that Complexul Energetic Oltenia (CEO) currently has are caused by the fact that the merger of the three…
48,000 apartments disconnected last year from district heating
About 48.0000 apartments in Romania were disconnected last year from the centralized heating systems, and art the present own an…
The European Commission is preparing a post-2020 directive for renewable energy
The European Commission (EC) is preparing a directive on renewable energy for the period after 2020, and the public consultation…
ELCEN organizes a bid for a 7 million euro refurbishing contract
Electrocentrale Bucuresti (ELCEN) plans to retrofit two boilers with hot water (CAF) of 100 Gcal / hour (Gcal / h)…
CEH director will get a 50% wage cut
Starting from Monday, the top management of Hunedoara Energy Complex (CEH) is willing to reduce the unity managers’ wage with…