Transgaz builds the supply pipeline of the Mintia plant, an investment of 60 mln. euro
The Minister of Energy, Sebastian Burduja and the General Director of Transgaz, Ion Sterian, signed a financing contract for the…
The Minister of Energy, Sebastian Burduja and the General Director of Transgaz, Ion Sterian, signed a financing contract for the…
Burduja: Portile de Fier III HPP could have a significant impact on the environment and navigability The construction of a…
The National Energy Strategy will be put up for public debate in two weeks, to be approved by Government Decision…
The Ministry of Energy is preparing the launch of the call for the cogeneration of electricity and heat (CHP) from…
Romania had in the second half of 2023 the third lowest price paid by the population for natural gas and…
Romania entered the straight line towards the production of wind energy off the Black Sea, and at the pace imposed…
Storage represents the main emergency of the national energy system and that’s why we insisted on two components, on the…
The feasibility study for an LNG terminal at the Black Sea, on the Romanian coast, was completed with positive results.…
The Minister of Energy, Sebastian Burduja, signed, during his visit to the United States of America, a letter of intent…
The green transition cannot be accomplished with green energy alone and it would be foolish to give up natural gas…
The biggest need of the Romanian energy system today is the storage facilities and without them there is no energy…
About 13 non-binding offers were submitted for carrying out the feasibility study in Tarnița-Lăpuștești, announced the Minister of Energy, Sebastian…
The shares of the Hidroelectrica offer were oversubscribed 4.7 times, representing an amount of 6.25 billion lei, and this historic…